toroid iso

Phone Number: 800-867-3526
1-800-TORELCO

Email: info@torelco.com

  • Custom Solutions for all your Winding Needs.

    Custom Solutions for all your Winding Needs.

  • Specializing in Toroid and Bobbin Winding

    Specializing in Toroid and Bobbin Winding

  • Over 55 Years of Experience

    Over 60 Years of Experience

We can manufacture the complete coil for the QEG. We also offer the complete kit for the system. Please call us for pricing and delivery.

Since 1962, the industry has known Torelco as a partner that supplies superior-quality toroids shipped to you with flawless adhesion to delivery schedules. Toroids from .050 inside diameter to 40 inches outside diameter (larger special order can be done) can be wound using wire sizes from 5 AWG through 46 AWG in open or cased styles, varnish or epoxy encapsulated. Torelco is equipped to meet your requirements for bobbin wound devices with the same attention to quality and service that the industry has expected from our toroid line. Please allow Torelco to quote on E-I laminated, ferrite core, and all other custom bobbin wound magnetic device styles.
Since 1962, the industry has known Torelco as a partner that supplies superior-quality toroids shipped to you with flawless adhesion to delivery schedules. Toroids from .050 inside diameter to 40 inches outside diameter (larger special order can be done) can be wound using wire sizes from 5 AWG through 46 AWG in open or cased styles, varnish or epoxy encapsulated. Torelco is equipped to meet your requirements for bobbin wound devices with the same attention to quality and service that the industry has expected from our toroid line. Please allow Torelco to quote on E-I laminated, ferrite core, and all other custom bobbin wound magnetic device styles.

Toroid Winding Experts

Specializing in custom coil and bobbin winding

Toroids

Toroids

Toroids from .050 inside diameter to 30 inches outside diameter can be wound using wire sizes from 7 AWG through 46 AWG in open or cased styles, varnish or epoxy encapsulated. We also work with larger sizes for custom orders. We proudly offer a wide range of toroid winding services. Call us today for a full-list of capabilities.

Coil Winding & Bobbin Winding

Coil Winding & Bobbin Winding

Torelco is equipped to fill your requirements for bobbin wound devices with the same attention to quality and service that the industry has come to expect from our toroid line. Bobbins are cylinders (with or without flanges) on which wire is wound. The devices function as the container for the wire that acts to create the shape of the coil.

Special Packaging

Special Packaging

Special packaging requirements are Torelco's specialty. Let us customize a device to provide a perfect fit with your application. Utilize our versatility to create solutions to your unique conditions. We specialize in providing custom toroid and bobbin transformers that are built to the exact specs of drawings provided to us.

Related Reading

What Factors Should You Consider When Choosing a Toroidal Inductor or Transformer for Your Application?

If your system is sensitive to electromagnetic interference or audible hum, toroids reduce external fields; however, choose core materials and winding...

Read More

How Does the Toroid Shape Reduce Electromagnetic Interference and Improve Efficiency in Transformers and Inductors?

The toroid—a doughnut-shaped magnetic core—addresses these issues through geometry. The toroid shape reduces electromagnetic interference (EMI) and enhances efficiency.

Read More

What a Toroid Really Does For Your Design

That is where a toroid earns its keep. A toroid’s purpose is to confine magnetic flux in a closed path so you move energy efficiently, filter noise cleanly...

Read More